OPERATIONS
Frank Gehry bridge
- Dimensions: 75 m. large/ 28 m. broad
- Investment: 5,7 milion euros
- Proyect: UTE Arenas y Asociados – CV Ingeniería
- Inauguration: 14-09-2015
Of the three bridges included in the Zorrotzaurre project, the first to be built is the one joining Deusto (at the IMQ Zorrotzaurre Clinic) to the future island. Building was carried out at the same time as the works to open up the Deusto canal.