Idom awarded the contract to draw up the Project for the strengthening of the riverside quays on the Bilbao river estuary in Zorrotzaurre

Zorrotzaurre

Idom awarded the contract to draw up the Project for the strengthening of the riverside quays on the Bilbao river estuary in Zorrotzaurre

28/10/2016

The Zorrotzaurre Contracting Board has awarded the contract to draw up the project for the strengthening of the riverside quays on the Bilbao river estuary within the Zorrotzaurre Execution Unit 1.

The winning company offered 90,508 euros (VAT included) to undertake the work and has a period of 4 months to deliver the project.

8 offers were presented after the call for tenders with a budget set at 102,850 euros (VAT included).

Previous
Bilbao City Council rescinds the contract for the opening up of the Deusto canal
Next
Anniversary: It is twelve years since the initial public presentation of the Zorrotzaurre Master Plan
close