OPERATIONS
San Ignacio – Zorrotzaurre bridge
- Dimensions: 75 m. long / 28 m. wide
- Estimated investmenT: 8 million euros (VAT excluded)
- Project: LKS Ingeniería
- Estimated construction start date: 3rd quarter of 2017
The second of the bridges planned for the Zorrotzaurre project will join the San Ignacio area (from near the new IDOM building) to the future island of Zorrotzaurre. The Basque Government is financing the bridge.